Information provided at the meeting may be downloaded below. A public meeting was held at the Sherman Municipal Ballroom at 405 N. All input will be considered as TxDOT moves forward. As TxDOT develops the proposed improvements, we are reaching out to communities within the project corridor and interested citizens to get input and comments. TxDOT is seeking input on the proposed roadway improvements for US 75. Animation of US 75 southbound mainlines from North Travis Street to Houston Street.Animation of Washington Street Closure Detour.However, there are alternate routes for trucks crossing into Detroit at the Ambassador Bridge, which include I-94, M-85 (Fort Street), Jefferson Avenue, and Dix Highway. Animation of Northbound Mainline Traffic Switch Houston & North Travis Street The main detour for traffic coming from north of the city is southbound I-75 to westbound I-96, then southbound I-275 to southbound I-75 in Monroe.Animation of Southbound Mainline Traffic Switch Houston Street to Park Avenue.US 75 Sherman, TX – Houston Street Detour after July 1st.US 75 Sherman, TX – Opening of Washington Street.US 75 Sherman, TX – Northbound Mainlane Detour.US 75 Sherman, TX – Houston Street Detour.US 75 Sherman, TX – Lamar Street Detour Southbound I-75 traffic will be detoured off the interstate between SR 52 (Exit 285) and SR 54/CR 54 (Exit 279) between 9 p.m.US 75 Sherman, TX – Closure of SH 56 (Lamar & Houston Street).New overpass will be constructed at South Travis Street to provide east-west direct connection to and from the new Sherman High School. The proposed improvements to the US 75 and US 82 interchange would involve the addition of frontage road lanes and U-turns at the US 75 and US 82 interchange, as well as intersection improvements at North Travis Street and Loy Lake Road. Ramps, bridges, retaining wall, new storm drain system, and interchanges would be reconstructed as necessary. The Ultimate Project would involve reconstruction of US 75 to add main lanes, continuous frontage roads, and U-turns. TxDOT is addressing needed improvements for the US 75 corridor in an Ultimate Project that has potential for phased implementation, in addition to improvements to the US 75 and US 82 interchange. The purpose of the project is to improve safety, address congestion, improve traffic operations, improve drainage, and address roadway deficiencies. Other work includes detour route paving, drainage improvements, tree removal, sign replacement, and new pavement markings. TxDOT is now moving forward from program level planning to project development to implement specific improvements to US 75. TxDOT previously conducted a study to assess safety, maintenance and system efficiency, congestion, and freight reliability, environmental sustainability, transportation choices and economic vitality along US 75, one of the most important transportation links in Grayson County. The US 75 Project is a TxDOT project to develop long-term transportation and operational improvements on US 75 and US 82 in the cities of Sherman and Denison in Grayson County, Texas.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |